Protected: December 23, 2014

December 23, 2014 Quite a day today at the Museum. The drywall crew worked hard and quickly today but didn’t quite get all the drywall all up and ready for the inspection. So we will call for the inspection for Friday if the County is inspecting on that day...

Protected: December 22, 2014

If anyone needs dust just stop by the Museum, we have it in quantity. Saturday we contacted Marcos Lopes to remove the tile and old carpet from the new curator room. He was finished by Sunday at 5 PM. A very dirty job that resulted in fine dust throughout the museum....

Protected: December 19, 2014

Brent Davis and crew were at the museum at 0700 for the past three mornings. I called for the dry wall inspection in the curator room on Tuesday. We passed the inspection. The ceiling in the new curator storage room is not a thing of beauty. There are wires hanging...

Protected: December 16, 2014

December 16, 2014 The insulator (one lone fellow) was in yesterday at about 0830. He gave me the bill before he started any work. I thought that a little bit ahead of things but he was done insulating everything by1500. Brent Davis’ crew started hanging...

Protected: December 13, 2014

December 13, 2014 We passed the drywall inspection yesterday. All of the items on the compliance list have been complied with except one or two that do not need to be done until the final. I’ll provide a summary of the status of the compliance items at the end...